Most of the items below are unglamorous and most get scoped last. That is the reason production launches slip. Walk it before the launch date is committed. Any item you cannot answer is scope that has not been costed yet. A “no” is not a blocker on its own; an undiscussed “no” is.
01
Interface contract
Every team downstream is blocked until these are fixed. Settle them before tuning anything.
02
Failure behavior
Production systems are judged on what they do when they are wrong. Design this before the happy path.
03
Evaluation
If you cannot rerun the evaluation, you cannot safely change anything afterwards.
04
Observability
Conventional monitoring tells you the service responded. It does not tell you the response was sensible.
05
Data and privacy
Usually the item that delays a launch when it is discovered late.
06
Rollout
Each stage exists to surface a different class of problem.
07
Ownership
An unowned system becomes an unmonitored one, and an unmonitored system fails silently.
If most of this is already in place, the remaining work is probably smaller than it feels. If most of it is not, the gap between the prototype and the launch date is larger than the plan currently says, and it is better to know that now.
Published by Talavishiraaj Groups. Copy it, adapt it, put it in your own repository. No attribution required. The reasoning behind it: why AI prototypes stall before production.
More gaps than you expected?
That is usually the point at which it is worth a conversation. Describe your situation and we will reply with a view.